Open Mon–Fri 8:30–16:30 · Sat 8:30–12:00 · closed Sunday|Lumberyard & showroom visits by appointment onlyVisits by appointment only

Resources · Estimator

Decking Fastener Estimator

Estimate how many boards, screws or hidden clips a deck needs from its area, the board format and the joist spacing.

Assumptions you can change

  • Boards run across the joists and end on a joist.
  • Joists crossed per board = board length ÷ joist spacing, rounded down, plus one.
  • Default of two screws per board at each joist, in line with the guidance on our Hardware page. Lower the intermediate count if your installer uses one.
  • Hidden clips: one per board at each joist; each clip is shared by two boards.

This is a planning aid, not an engineering calculation. It does not size joists or check loads.

Screws and clips are alternatives: choose one fixing method. Quantities are estimates; we confirm them on your drawings.

Stock

Request current stock

Tell us the species, dimensions and quantity. We reply with what is available now.

Projects

Send your drawings

Architects, designers and contractors: share plans and quantities and we will come back with a tailored proposal.

Visit

Visit by appointment

We are open Monday to Friday 8:30–16:30 and Saturday 8:30–12:00 (closed Sundays). Visits to the lumberyard and showroom are by appointment only.